Showing posts with label construction. Show all posts
Showing posts with label construction. Show all posts

Sunday, August 24, 2025

Transformer fire on First Avenue

 

On August 21, 2025 at about 9:30 am I noticed the lights in our apartment were flickering.

When I looked out the window, I saw a fire engine below and when I looked south, I saw why.  Yikes.



Sadly, transformer fires are fairly common in New York these days. Our infrastructure is old.

But this particular corner received plenty of attention during the construction of the second avenue subway, so I was surprised to hear that tree roots had wrapped around the wires.



Here are some photos of that construction.  But I realize now that they are 13 years old.  So, the root problem makes a bit more sense.  Still, I wonder if it was the deluge the night before that caused the fire.

https://pj-studio.blogspot.com/2012/06/second-avenue-subway-part-1.html

Here’s another blog about the construction.

https://pj-studio.blogspot.com/2012/06/2nd-avenue-subway-part-2.html

As I mentioned the FDNY was on the scene in no time.




But as it turns out, the fire department is not allowed to do anything until Con Ed arrives.  That’s probably a good idea. There might be stuff down there that does not react well to water.



At 12:30 pm we were informed that our power would be turned off so repairs could proceed and might not be restored for 24 hours or more.

I’m not sure why we didn’t head to a hotel like our smarter neighbors, but we had water and candles, so we decided to hang in there.



When we lost our water at 8:00 pm I realized that we had probably made a mistake.




At 9:00 pm the drilling started.  It went on until about 10:30 pm.


It’s hard to believe that all this concrete,


came from this small section of sidewalk and street.



At 3:00 am our power was restored!  Thank you, Con Ed!!!




Ciao,

PJ

 

© 2025 PJ Lehrer


Sunday, July 17, 2022

East Midtown Greenway 3

 

Construction work continues on the East River Esplanade extension.  


Apparently plans include revamping the Andrew Haswell Green Park. Thanks Andrew - whoever you are. ;-)


These photos are from the stretch between 61st and 53rd streets where they are building the extension on piers over the river.  


It's very picturesque.  Lots of primary colors.


It was supposed to be finished May 2022.  Oops.


Of course the delay does not explain why the esplanade has been closed between 68th and 70th Streets for the past few months.  


The entrance at 71st Street is also closed.  


For some odd reason this has really upset Edward.  


I keep telling him that the entrance on 78th is still open and he can walk north.  


But for some reason he doesn't want to.  I guess the views aren't as nice.


Here are the previous blogs...

https://pj-studio.blogspot.com/2021/06/east-midtown-greenway-p2.html

https://pj-studio.blogspot.com/2021/03/building-east-midtown-greenway.html

 

Cheers!

PJ

 

(c) 2022 PJ Lehrer